Case study · School · Mechanical
Kestral House School
A full mechanical design and build at Kestral House School in Crouch End, London, covering the hot water system with two large water heaters, the cold water services and a cold water booster pump set.
Sector
School
Trade
Mechanical
Scope
Full mechanical design and build
Location
Crouch End, London
What we did
01
Hot water system
Design and installation of the full hot water system, including two large water heaters.
02
Cold water services
Design and installation of the cold water services for the whole school.
03
Booster pump set
Design and installation of a cold water booster pump set.
The project in detail
The brief
Kestral House School needed the mechanical services for the entire school designed and installed, including a cold water booster pump and two large water heaters.
How we delivered it
Our experienced team delivered the work on the ground, working closely with the other trades on site, and the project was completed on time.
The result
The school was inspected on completion and all of the mechanical works were found to be compliant, with no issues to put right.
Photos from Kestral House School
Plant room: the new cold water booster pump set and water heater
Twin pump cold water booster set
Low level copper pipework runs
High level copper pipework on ceiling supports
First fix copper pipework at ceiling level
Isolation valves on the new pipework
Finished washroom with wash trough
Finished WC and hand basin
Finished WC cubicle
Planning similar work?
Send us the drawings or a short brief and we will come back to you with a clear written quotation.
Contact us